Clifton Engineers
The day we left 6 weeks back, a series of trucks was rolling up to the beach access ramp. Another deluge had previously dug a new trench thru the sand despite the work to clear the channel where the water was intended to go. This time a metal side wall has been placed and the rock wall removed. Also a more porous drain has been placed beside the ramp. This will have no effect as I have not observed any runoff from this direction. We eagerly await the next storm. Whilst on the inspection we did some shopping with the handy trolley that someone left. We got a bargain blue drum with some mussels and five bags of dog poo, which the laziest of dog walkers have left on the beach.