Friday, 11 December 2020

Beach Repair

 There has been a lot of action on the beach at both ends.  The boardwalk excavation has finished so the mega digger has climbed up from below. In the meantime another tractor went down and has buried most of the  dried sea grass.   This was not as good a job as last time but is better than it was.  Someone will eventually work out that there is not enough sand to keep burying this stuff. We have also finished grappling with the decos and have finally got the colours in the right locations. Debbie is madly getting some drip water systems going before we head out so that hanging plants will get some moisture.



Clean beach

Red Door

Coloured deck


No comments:

Post a Comment